Lusardi Construction Company

The New Double Peak K-8 School Opens it's Doors to San Marcos  

Posted: Thursday, August 18, 2016


When the campus opens it's doors to the faculty on Monday (August 22) and students the following Monday (August 29) they well arrive to what is the first of its kind for the San Marcos Unified School District. The new Double Peak K-8 campus consists of a 15,000 square foot gymnasium, 17,000 square foot multi-purpose and kitchen building, two-story 20,500 square foot administration building, 27,000 square foot science and library building, and a 40,400 square foot classroom building. The school was constructed to hold a maximum of 1,500 hundred students; a number calculated to accommodate the growth of the San Elijo community. The campus includes a library, Innovative Room, MPR (Multi-Purpose Room), gym and locker room, band room, K-5 music room, art room, science lab flex lab, and student collaboration center. The buildings are a combination of tilt-up concrete construction, concrete masonry, and exterior framing.